Utilized inventory control system to remove inventory pods from the operating floor.
Moved pods from the 2nd, 3rd, and 4th floors to the ground floor utilizing large industrial forklifts.
Loaded pods onto tractor trailers for shipment to greenfield facilities.
Upon delivery at greenfield site, trucks were unloaded, lifted to the appropriate floor and inducted into the inventory system.
Empty pods from the greenfield site were then loaded into empty trucks and returned to the operation site to be loaded with inventory.
The project was executed between 8 operational sites and 7 greenfield sites.
During the project, shifts were run on a continual 24/7 basis.
NPSG utilized approximately 1,200 people on this project.